zenith building manchester

manchester, england

The building was completely stripped out with new full height glazing added on all elevations. In addition, two new floors were constructed to the top of the building with plant area located over. This was all achieved with the Post Office in occupation on the ground floor during construction.

BCO Regional Winner: Workplace 
Winner for Manchester Society of Architects Commercial Award