winnersh triangle slough
slough, england
Foreman Roberts Engineering & Sustainability teams worked closely with the design team resulting in a 50% carbon saving over and above the 2006: Part L National Building. This was achieved using a detailed MEP model, defined glazing and structural requirements. Further carbon savings were obtained using boreholes coupled with chilled beam providing a highly efficient working system. The building achieved a high standard EPC rating.