Palace of Westminster, London

London, England

Foreman Roberts worked continuously at the Palace of Westminster for a period of eight years, during which we were responsible for the design and inspections for a multitude of engineering tasks, ranging from survey and reporting work to full replacement of major plant installations for central boilers and chiller systems, with the over-riding requirement that operations within the buildings were not interrupted by the works.