New Build Data Centre – Hertfordshire

Hertfordshire, UK

With a total of 9,600 m² of IT space and a maximum of 24 MW IT load, this data centre offers complete solutions for housing IT and network systems in a secure, high-availability environment.

Provided with the best possible physical and technical infrastructure supported by N+1 UPS systems, N+1 generator backup, as well as N+1 cooling systems – this Data Centre holds multiple certifications and is connected to major carrier hubs in the Docklands and Slough.

It will be a fibre-connected campus and fully integrated with other data centre facilities in the clients portfolio, allowing their clients to continue growing. Foreman Roberts have provided MEP design support for Phase 1 to the contractor team from Stage 3 through Stage 4 and are currently providing design support for Phase 2 of this data centre project.